CFR Shipping from China: Cost, Risk & Buyer Guide

CHINA ORIGIN / SELLER-PAID OCEAN FREIGHT / BUYER TRANSIT RISK

CFR Shipping from China: Seller-Paid Ocean Freight and Buyer Risk

CFR means Cost and Freight. Under CFR, the seller delivers the goods by placing them on board the vessel at the agreed port of shipment and contracts and pays for carriage to the named destination port. Risk, however, transfers to the buyer when the goods are on board at the shipment port—not when the vessel reaches the destination port.

By Ivan · Commercial terms reviewed: September 2026
Message on WhatsApp

This separation between cost and risk is the central point of CFR shipping from China. A buyer may carry the risk for the ocean voyage even though the seller contracted and paid for the main carriage. The buyer should therefore confirm the shipment port, named destination port, on-board evidence, insurance, destination charges, import arrangements and cargo-specific requirements before shipment.

Scroll sideways to compare the full table.

CFR questionStandard planning position
Where can CFR be used?Sea or inland-waterway transport.
Who contracts the main carriage?The seller contracts carriage to the named destination port.
Who pays the contracted freight?The seller pays the contracted freight to the named destination port.
When does the seller deliver?When the goods are placed on board the vessel at the agreed shipment port.
When does risk transfer?At the same on-board delivery point—not on arrival at destination.
Who handles export clearance?The seller, where export clearance applies.
Who handles import clearance and duties?The buyer under the standard CFR allocation.
Must the seller arrange cargo insurance?No. CFR contains no standard seller insurance obligation.

These positions summarize the International Chamber of Commerce's Incoterms® 2020 framework. The complete CFR rule, sales contract and connected carriage, insurance and finance agreements remain controlling. ICC: Incoterms® and Commercial Contracts

CFR · TWO PORTS / TWO MOMENTS
01 · Shipment portGoods placed on boardDelivery + risk transfer
02 · Ocean voyageSeller contracts carriageBuyer carries transit risk
03 · Destination portNamed CFR destinationSeller-paid freight endpoint

What Does CFR Shipping from China Mean?

CFR is one of the four Incoterms® 2020 rules intended for sea and inland-waterway transport. It allocates selected obligations, costs and risks between a seller and a buyer under a contract for the sale of goods.

A CFR reference should identify the destination port and the applicable edition, for example:

CFR [precise named destination port], Incoterms® 2020

That named port identifies how far the seller must contract and pay the main carriage. It does not identify the place of delivery or the point where risk moves from seller to buyer. Under CFR, those events occur earlier, when the goods are placed on board the vessel at the agreed port of shipment.

Incoterms® rules do not replace the rest of the commercial and operational record. CFR does not, by itself, decide:

  • when ownership or title to the goods passes;
  • when or how the buyer pays the seller;
  • which law governs the sales contract;
  • whether cargo insurance exists or covers a particular loss;
  • whether a product may be exported or imported;
  • which tariff classification, customs value, duty or tax treatment applies;
  • whether a carrier accepts a battery or other regulated cargo;
  • whether destination unloading, terminal handling or final delivery is included; or
  • which party has a remedy under a carriage, insurance or finance contract.

The ICC explains that Incoterms® rules address obligations, costs and risk within the sales relationship but do not themselves form a complete sales contract or control title transfer. ICC: Incoterms® and Commercial Contracts

Why Does CFR Have Two Critical Ports and Two Different Moments?

CFR is easier to operate when the parties treat the shipment port and destination port as two separate controls.

Port of shipment: delivery and risk transfer

At the agreed port of shipment, the seller places the identified goods on board the vessel. That is the CFR delivery event. Risk of loss of or damage to the goods normally transfers to the buyer at this point.

The operating record should capture:

  • the exact shipment port and terminal where relevant;
  • the vessel and voyage;
  • the packages or cargo lots loaded;
  • the on-board date;
  • the bill of lading or other agreed transport evidence; and
  • the notice given to the buyer so the buyer can manage insurance and destination arrangements.

Named destination port: seller-paid carriage

The destination port written after CFR defines the endpoint to which the seller must contract and pay carriage. The seller's transport contract continues after risk has moved to the buyer.

This creates the distinctive CFR sequence:

Scroll sideways to compare the full table.

StageDelivery and risk positionFreight-cost position
Before on-board deliverySeller normally bears cargo riskSeller prepares delivery and the carriage arrangement
Goods placed on board at the agreed shipment portSeller delivers; risk normally transfers to buyerSeller-paid carriage begins or continues
Ocean voyageBuyer normally bears cargo riskSeller pays the contracted freight to the named destination port
Arrival at named destination portNot a second CFR risk-transfer eventSeller's contracted carriage reaches its stated destination
Import, release and onward deliveryBuyer-side scope under the standard ruleDepends on the quotation and any additional agreement

The ICC describes this as a feature of the C rules: the named destination is the place to which the seller pays carriage, while delivery and risk transfer occur earlier on the seller's side of the main transport. ICC: Incoterms® and Commercial Contracts

When Do Delivery and Risk Transfer Under CFR?

Under the standard CFR rule, delivery and risk transfer occur when the goods are placed on board the vessel at the agreed port of shipment. The result can feel counterintuitive because the seller is still responsible for contracting and paying the freight to the destination port.

Consider a hypothetical shipment sold as:

CFR Port of Rotterdam, Incoterms® 2020

The parties separately agree that the goods will be loaded on board at Shanghai. Once the identified goods are on board the contracted vessel at the agreed Shanghai shipment port, delivery occurs and risk normally moves to the buyer. The seller still pays the contracted freight to Rotterdam. If the goods are damaged during the ocean voyage after delivery, the buyer normally bears that cargo risk under the standard allocation. The complete contract, any seller breach and the buyer's rights under its insurance or carriage arrangements may affect the outcome.

The buyer should not treat a prepaid-freight notation as proof that the seller retains risk to destination. Freight payment and cargo risk answer different questions.

The contract and shipment file should make the risk point provable. Useful evidence may include:

  • an on-board bill of lading or other agreed transport document;
  • vessel, voyage and loading-port data;
  • cargo identification and package count;
  • the on-board date;
  • loading or terminal records where available; and
  • the seller's shipment notice to the buyer.

If the parties want a different allocation, the variation must be expressed clearly and checked for consistency across the sale, carriage and insurance arrangements. Informal wording should not leave the insurer, carrier, seller and buyer working from different risk assumptions.

What Must the Seller Arrange and Pay?

The seller's standard CFR responsibilities begin with providing the goods and commercial invoice required by the sales contract. The seller also delivers the goods on board at the agreed shipment port, completes export clearance where applicable, and contracts and pays carriage to the named destination port.

For a shipment from China, the seller-side operating plan should identify:

  • the legal seller and exporter/consignor structure;
  • the goods, quantity, packages and agreed specification;
  • checking, packing and marking required for transport;
  • the China pickup and origin-handling arrangement;
  • the agreed shipment port and loading period;
  • the carrier, vessel/service and destination port;
  • export declaration responsibility and supporting records;
  • any cargo-specific booking or dangerous-goods information;
  • freight and surcharges covered by the seller's quotation;
  • the required transport document; and
  • the shipment notice and documents to be sent to the buyer.

Under the standard CFR allocation, the seller bears the costs and risks up to delivery on board and pays the carriage it contracts to the named destination port. The seller must also provide the agreed evidence that enables the buyer to receive the goods from the carrier.

That does not mean the seller automatically:

  • retains cargo risk until arrival;
  • buys cargo insurance for the buyer;
  • clears the goods for import;
  • pays import duties or taxes;
  • pays every destination terminal or release charge;
  • provides final delivery to the buyer's premises; or
  • guarantees vessel space, carrier acceptance, customs release, price or arrival time.

An expanded service can be agreed, but it should be shown as an additional contractual service rather than assumed from the letters CFR.

What Must the Buyer Arrange and Pay?

The buyer takes the post-delivery risk and must be ready to manage it before the seller loads the goods. Waiting for an arrival notice to consider insurance or destination arrangements is too late.

A practical buyer-side plan should cover:

  1. Confirming the exact CFR named destination port and Incoterms® edition.
  2. Confirming the agreed shipment port and the evidence of on-board delivery.
  3. Deciding on cargo insurance that attaches no later than the buyer's risk point.
  4. Receiving the seller's shipment notice and transport documents.
  5. Appointing the destination importer and customs broker.
  6. Completing import formalities and paying applicable duties, taxes and buyer-side customs costs.
  7. Paying destination, unloading, release or onward-transport costs that are not included in the seller's carriage contract.
  8. Taking delivery from the carrier and arranging inland delivery where required.
  9. Preserving documents and giving timely notice if loss or damage is discovered.

The buyer should also plan for exceptional costs. Customs inspection, storage, demurrage, detention, port congestion, document correction, re-delivery or disposal may be governed by several contracts and local rules. The three-letter Incoterm alone does not safely assign every exceptional invoice.

Who Arranges Cargo Insurance Under CFR?

CFR does not impose a standard obligation on the seller to contract cargo insurance for the buyer. Because risk normally transfers at on-board delivery, the buyer should decide on suitable insurance before that event.

The buyer's insurance review should address:

  • the insured party and insurable interest;
  • the insured value and currency;
  • the cargo description and packaging;
  • the complete route, shipment port and destination port;
  • the attachment and termination of cover;
  • storage, transshipment and inland legs if required;
  • exclusions, deductibles and sub-limits;
  • dangerous-goods or battery disclosures;
  • survey, notice and evidence requirements; and
  • the claims contact and time limits.

Carrier liability and cargo insurance are not interchangeable. A carrier's liability may be limited by the carriage contract or applicable regime, while an insurance policy responds only according to its wording, conditions and exclusions.

The seller may provide information needed for the buyer's cover, including commercial value, package details, vessel, voyage, shipment port, destination port and on-board date. Providing that information or assisting with a policy does not automatically convert CFR into CIF.

CIF uses the same maritime on-board delivery and seller-paid freight structure but adds a seller obligation to contract insurance against the buyer's transit risk in accordance with the CIF rule. ICC Academy: CFR or CIF?

Is CFR Suitable for Containerized Cargo?

CFR is legally structured around delivery on board a vessel. Many container shipments operate differently: the seller may hand a sealed container or consolidated cargo to a terminal, depot, forwarder or inland carrier before the container is loaded on the vessel.

This can create a mismatch between the physical handoff and the CFR delivery point. The seller may no longer control the goods during the period between terminal receipt and on-board loading, while the standard CFR risk point has not yet occurred.

For containerized cargo, the parties should compare the actual handoff with alternatives:

  • FCA can align delivery with a buyer-nominated carrier or terminal handoff when the buyer controls the main carriage.
  • CPT can align a seller-paid carriage structure with delivery to the contracted carrier and can be used for any mode or multimodal transport.
  • CIP uses the CPT-style carrier handoff and adds a seller insurance obligation under that rule.

This does not make every container shipment under CFR automatically invalid. It means the parties should not select CFR merely because the main leg travels by sea. The delivery point, custody chain, bill-of-lading requirement, carriage control and insurance attachment should match the real operation.

ICC guidance notes that FCA is typically a better choice for containerized goods when delivery occurs before loading on board. ICC Academy: Place of delivery and risk transfer

Which Port Names and Points Must Be Written Precisely?

The safest contractual structure names the destination port precisely and states the edition:

CFR [named destination port and agreed point where appropriate], Incoterms® 2020

The operating file should then record the agreed shipment port separately. CFR needs both pieces of information even though only the destination port is written after the rule.

Avoid descriptions such as:

  • CFR Europe;
  • CFR USA;
  • CFR buyer's port;
  • CFR main port; or
  • a city name that could refer to several terminals or nearby ports.

The parties should confirm:

  • named destination port and terminal/point where relevant;
  • agreed shipment port and loading point;
  • vessel/service and any permitted transshipment;
  • who selects the carrier and route;
  • shipment window and cutoff responsibilities;
  • whether a substitute port or terminal is allowed;
  • which transport document is required; and
  • which destination services are included in the seller's carriage contract.

The ICC recommends using the structure [chosen Incoterms® rule] [named port, place or point] Incoterms® 2020 and being geographically specific. ICC: Incoterms® and Commercial Contracts

What Should a CFR Freight Quotation Include?

A CFR price is useful only when its service scope is visible. The buyer should classify each item as included, excluded, provisional or payable directly.

Scroll sideways to compare the full table.

Cost or serviceWhat to confirm
Origin pickupSupplier address, vehicle, appointment, waiting time and access requirements
Origin loadingLabour, forklift/crane, securing, package condition and loading evidence
Export clearanceExporter/declarant, customs broker, filing, supporting records and inspections
Shipment-port chargesTerminal handling, documentation, weighing, storage and security charges
Main ocean freightCarrier/service, equipment, route, transshipment, rate validity and surcharges
Destination unloadingWhether unloading is included in the seller's carriage contract
Destination terminalHandling, release, documentation, local surcharge and storage responsibility
Import formalitiesImporter, broker, tariff classification, customs value, duties, taxes and permits
Final deliveryDestination address, vehicle, appointment, access, unloading and return conditions
ExceptionsDemurrage, detention, examination, amendment, re-delivery, disposal or delay-related costs

For every quotation, also confirm:

  • cargo description and package count;
  • dimensions, individual weights and total gross weight;
  • container size or freight basis;
  • stackability and lifting requirements;
  • named shipment and destination ports;
  • route and transshipment assumptions;
  • dangerous-goods status and carrier-acceptance conditions;
  • origin and destination free time;
  • currency and exchange-rate basis;
  • validity date and sailing window;
  • space/equipment conditions; and
  • services that remain subject to actual cost.

“Freight prepaid” on a bill of lading does not mean every destination charge is paid. Likewise, a CFR sales price does not reveal which local charges the seller's carriage contract includes. The quotation, carrier tariff and destination agent's scope must be reviewed together.

Which Shipping Documents Matter Under CFR?

The required document set depends on the sales contract, payment method, cargo, route, carrier and destination. A CFR shipment commonly uses:

  • commercial invoice;
  • packing list;
  • bill of lading or agreed transport document;
  • export customs records;
  • certificate of origin or other origin evidence where required;
  • product permits, licences or inspection records where applicable;
  • buyer-arranged cargo insurance evidence;
  • arrival, release and import documents; and
  • cargo-specific safety or dangerous-goods documents where required.

Document consistency matters. Product name, model, quantity, package count, weights, ports, parties and marks should align across the sale, booking, customs and transport records.

If payment uses a documentary credit or another document-controlled mechanism, the bank examines the documents under that arrangement—not the physical cargo. The sales term, letter of credit, transport document requirements and carrier's ability to issue the requested document should be checked before loading.

An Incoterm does not bind the carrier, bank or insurer unless the relevant agreement independently does so. The ICC recommends aligning the sales contract with the connected carriage, insurance and finance contracts. ICC: Incoterms® and Commercial Contracts

How Does CFR Compare with CIF, FOB and CPT?

Choose the rule that matches the real handoff, transport mode, carriage control and insurance plan.

Scroll sideways to compare the full table.

RulePermitted modesWho normally contracts main carriage?Delivery/risk pointStandard seller insurance obligationStandard import clearance
CFRSea or inland waterwaySeller, to named destination portGoods on board at agreed shipment portNoBuyer
CIFSea or inland waterwaySeller, to named destination portGoods on board at agreed shipment portYes, under the CIF ruleBuyer
FOBSea or inland waterwayBuyer normally arranges main carriageGoods on board at agreed shipment portNoBuyer
CPTAny mode or multimodalSeller, to named destinationHandoff to contracted carrier at agreed delivery pointNoBuyer

CFR vs CIF

CFR and CIF use the same sea/inland-waterway scope, on-board delivery point and seller-paid freight to a named destination port. Their central difference is insurance: CFR has no standard seller insurance obligation, while CIF requires the seller to contract insurance for the buyer's risk in accordance with the CIF rule.

The dedicated CIF shipping from China guide examines that insurance structure in more detail.

CFR vs FOB

CFR and FOB both deliver and transfer risk when the goods are on board at the agreed shipment port. Under CFR, the seller contracts and pays the main carriage to the named destination port. Under FOB, the buyer normally contracts the main carriage after the seller's on-board delivery.

The dedicated FOB shipping guide explains the buyer-nominated vessel and buyer-controlled freight model.

CFR vs CPT

CFR and CPT both require the seller to contract and pay carriage to a named destination, without a standard seller insurance obligation. The delivery mechanics are different. CFR is restricted to sea/inland-waterway transport and delivers on board the vessel. CPT works for any mode or multimodal transport and normally delivers when goods are handed to the seller's contracted carrier at the agreed delivery point.

The CPT shipping from China guide is the more relevant comparison when containerized cargo is received by a terminal or carrier before vessel loading.

What Changes When CFR Cargo Contains Batteries?

CFR allocates commercial delivery, risk and freight responsibilities. It does not classify batteries, select a packing provision, approve documents or require a carrier to accept a shipment.

For a battery, battery-powered product or energy-storage shipment, collect at least:

  • product name and model;
  • battery chemistry;
  • battery configuration—stand-alone, packed with equipment or contained in equipment;
  • condition—new, used, prototype, damaged, defective, recalled or waste;
  • applicable UN number where established by the responsible party;
  • watt-hour rating, lithium content, battery mass or other relevant technical data;
  • quantity and number of cells/batteries per package where relevant;
  • package type, dimensions, individual weights and total gross weight;
  • internal protection, terminal protection and package photographs;
  • available test summary and safety/product documents;
  • pickup location, shipment port, destination port and final country;
  • ready date and requested sailing; and
  • proposed carrier/service if known.

As of 9 September 2026, the International Maritime Organization lists the IMDG Code, 2024 Edition incorporating Amendment 42-24, as mandatory from 1 January 2026. The IMDG Code addresses packaged dangerous goods carried by sea, including classification, packing, container traffic, stowage and segregation requirements. IMO: IMDG Code IMO: Dangerous goods in packaged form

The actual shipment must be checked against the current rule, competent-authority requirements, port controls, carrier policy, vessel/service restrictions and destination requirements. A document name such as “UN38.3” or “MSDS” does not by itself prove that the cargo is correctly classified, packed or accepted.

Special-condition batteries require separate review. Do not treat damaged, defective, recalled, prototype, waste or heavily used batteries as ordinary cargo merely because a commercial invoice describes them as batteries or equipment.

The commercial and compliance records should remain connected but distinct:

Scroll sideways to compare the full table.

RecordPurpose
CFR sales termAllocates selected seller/buyer delivery, cost and risk responsibilities
Freight quotationDefines the commercial transport scope and charge assumptions
Carrier bookingRecords the service, route, cargo declaration and acceptance conditions
Dangerous-goods classificationEstablishes the regulated identity and applicable requirements
Packing and marks/labelsPrepare and communicate the actual package for maritime transport
Transport documentSupports delivery evidence and cargo release under the agreed arrangement
Insurance recordAddresses financial cover for the buyer's post-delivery exposure

BAT Logistics can review information supplied for a proposed shipment and help coordinate a route, document and carrier enquiry. Final classification, packing compliance, carrier acceptance, customs treatment and insurance cover depend on the actual cargo, current rules and responsible parties. For the wider operational process, see shipping batteries by sea.

Build a Practical CFR Shipment Record

Keep one shipment record shared by the seller, buyer and transport coordinator. It should make the two ports, risk point and freight scope visible.

Sale and CFR reference

  • seller and buyer legal names;
  • sales-contract and purchase-order references;
  • CFR [named destination port], Incoterms® 2020;
  • agreed shipment port;
  • cargo description, quantity and value; and
  • payment and document conditions.

On-board delivery record

  • carrier, vessel and voyage;
  • shipment terminal and loading point;
  • package/container identification;
  • on-board date;
  • bill-of-lading status;
  • delivery evidence; and
  • shipment notice sent to buyer.

Carriage and cost scope

  • origin pickup and loading;
  • export clearance and shipment-port handling;
  • equipment and ocean service;
  • named destination port;
  • included freight and surcharges;
  • included/excluded unloading and destination handling;
  • rate validity and free time; and
  • provisional or exception charges.

Insurance and claims

  • party arranging insurance;
  • insurer or broker;
  • insured value and currency;
  • attachment and expiry of cover;
  • route, storage and transshipment scope;
  • exclusions/deductibles requiring review; and
  • notice, survey and claims contacts.

Customs and destination

  • China exporter/consignor and customs broker;
  • export-document owner and status;
  • importer of record and destination broker;
  • permits or product controls;
  • duties, taxes and destination charges;
  • final-delivery party and address; and
  • exception-instruction contacts.

Battery or regulated-cargo record

  • chemistry, configuration and condition;
  • UN number where applicable;
  • technical ratings and quantity;
  • test-summary/document status;
  • package, marks/labels and photographs;
  • dangerous-goods declaration status where required; and
  • carrier acceptance and any restrictions.

This operational record does not amend the contracts by itself. Its value is exposing omissions before the seller places the cargo on board and risk moves to the buyer.

How Should a Buyer Review a CFR Quote?

Use this sequence before accepting a CFR price.

1. Confirm the cargo

Record the product, model, quantity, package type, dimensions, weights, condition and any battery or dangerous-goods characteristics. A rate based on “general cargo” is not reliable if the shipment is regulated or needs special handling.

2. Write the CFR reference correctly

Use CFR, the precise destination port and Incoterms® 2020. Confirm that the sales contract, purchase order and quotation use the same place and edition.

3. Identify the shipment port and on-board delivery point

Record where and how the seller will place the goods on board, which vessel/service is intended and what document will evidence the on-board date.

4. Separate risk from freight payment

Confirm in writing that the seller's paid carriage continues to the named destination port while buyer risk normally starts at on-board delivery.

5. Arrange insurance from the correct point

Do not wait until sailing to discover whether the buyer's policy attaches early enough or covers the cargo, route, storage and transshipment.

6. Itemize origin and destination charges

Mark every cost as included, excluded, provisional or payable directly. Confirm unloading, terminal handling, release, storage, demurrage, detention, customs, duties/taxes and final delivery.

7. Validate documents and carrier acceptance

Make sure the sales, booking, customs and transport data agree. For battery cargo, complete classification, packing, documentation and carrier checks before relying on the sailing plan.

8. Compare the operating model with other rules

Compare CFR with CIF if seller-procured insurance is intended, FOB if the buyer should control main carriage, and FCA/CPT if a container or multimodal handoff occurs before vessel loading.

This is a decision and scope checklist, not a quotation, compliance decision or guarantee. Rates, capacity, service, carrier acceptance, customs treatment and timing remain shipment-specific.

CFR Shipping Questions Buyers Ask

Does CFR include cargo insurance?

No seller insurance obligation is built into CFR. The buyer bears risk after on-board delivery and should arrange suitable cover from the applicable risk point. CIF differs because it requires the seller to contract insurance under that rule.

When does risk transfer under CFR?

Risk normally transfers when the goods are placed on board the vessel at the agreed shipment port. It does not automatically wait until the cargo reaches the named destination port, even though the seller pays the contracted freight there.

Does CFR include unloading at the destination port?

Not automatically in every shipment. The allocation can depend on whether unloading is included in the seller's carriage contract and on the parties' agreement. The quotation should state the unloading and destination-terminal scope explicitly.

Who pays destination charges under CFR?

The seller pays costs included in the carriage it must contract to the named destination port. The buyer may remain responsible for unloading, terminal, release, storage, demurrage/detention, import and onward-delivery charges that are outside that contract. Review each line rather than infer the answer from CFR.

Who completes import customs clearance under CFR?

The buyer handles import clearance and pays applicable import duties and taxes under the standard CFR allocation. The actual importer, broker, permits, valuation and filings must comply with destination law.

Can CFR be used for container shipments?

CFR is a maritime rule based on delivery on board the vessel. A container is often handed to a terminal or carrier before vessel loading, so FCA or CPT may align more clearly with the actual handoff. The correct choice depends on the real custody, carriage and document structure.

What is the difference between CFR and CIF?

Both use on-board delivery, buyer transit risk and seller-paid freight to a named destination port. CIF adds a seller obligation to contract cargo insurance in accordance with the CIF rule; CFR does not.

Can lithium batteries or other regulated batteries ship under CFR?

CFR does not decide whether a battery shipment is acceptable. Battery chemistry, configuration, condition, classification, packing, documents, route, current IMDG requirements, carrier policy and destination controls must be checked for the actual shipment.

Request a Shipment-Specific CFR Route, Document and Freight Review

A useful CFR review starts with the two ports and the actual cargo.

Send BAT Logistics:

  • supplier and China pickup address;
  • proposed shipment port and exact CFR destination port;
  • product name, model and intended use;
  • battery chemistry, configuration and condition where relevant;
  • package count, dimensions and individual/total weights;
  • packing photographs and available product or test documents;
  • target ready date and requested sailing window;
  • buyer/importer country and final-delivery address; and
  • any insurance, customs, documentary-credit or destination-service requirement already agreed.

BAT Logistics can use the supplied facts to review the proposed CFR structure, document gaps, freight scope and route enquiry. Carrier acceptance, space, insurance, classification, customs treatment, final charges and timing remain subject to the actual shipment and the responsible carriers, authorities, insurer and contracting parties.

Message on WhatsApp

Request a CFR Freight & Risk Review

Three fields. Include the China pickup, shipment port, exact CFR destination port, cargo, insurance plan, packing and ready date in one message.

A request does not guarantee carrier acceptance, customs release, insurance cover, space or route availability.