CHINA ORIGIN / DESTINATION DELIVERY AFTER SELLER UNLOADING
DPU Shipping from China: Seller Unloading, Delivery and Buyer Risk
DPU means Delivered at Place Unloaded. Under DPU, the seller arranges carriage to an agreed destination, bears cargo risk through the transport journey and completes unloading from the arriving means of transport. Delivery and risk transfer occur only after the goods have been unloaded and placed at the buyer's disposal at the precisely named place and point.
The buyer normally handles destination import clearance and pays applicable import duties and taxes. That creates a distinctive split: the seller controls transport and unloading, while the buyer controls import formalities and receives the unloaded goods.
A workable DPU shipment from China should answer five questions before booking:
- What is the exact named destination and unloading point?
- Which party and contractor will unload the arriving vehicle?
- What labour, equipment, access and safety conditions are required?
- Who is the lawful destination importer and who will complete import formalities?
- What evidence proves that unloading and DPU delivery are complete?
Scroll sideways to compare the full table.
| DPU question | Standard planning position under Incoterms® 2020 |
|---|---|
| Who arranges carriage to the named destination? | The seller. |
| Who bears cargo risk during carriage and unloading? | The seller until DPU delivery after unloading at the agreed place and point. |
| When does delivery occur? | After the goods have been unloaded from the arriving means of transport and placed at the buyer's disposal at the named destination. |
| Who handles export clearance from China? | The seller, where export clearance applies. |
| Who handles import clearance? | The buyer under the standard DPU allocation. |
| Who pays import duties and taxes? | The buyer under the standard DPU allocation. |
| Who performs and bears the risk of unloading? | The seller. |
| Must the seller arrange cargo insurance for the buyer? | No standard DPU obligation, although the seller bears risk through destination unloading and may insure its own exposure. |
| Can DPU be used for multimodal freight? | Yes. DPU can be used for any mode or combination of modes. |
These positions summarize the International Chamber of Commerce's Incoterms® 2020 DPU framework. The full rule, sale agreement, carriage contract, unloading contract and applicable law remain controlling. ICC Digital Library: DPU rule
What Does DPU Shipping from China Mean?
DPU is an Incoterms® rule for road, rail, air, sea or multimodal transport. It allocates selected delivery, risk, carriage, unloading, customs, cost and notice responsibilities between the seller and buyer. It does not replace the sale contract, freight quotation, carrier booking, customs instructions, lifting plan or receiving procedure.
A DPU reference should identify a precise place and, wherever possible, a precise point within that place:
DPU [exact terminal, facility, address and unloading point], Incoterms® 2020
This is an illustrative format, not contract wording for a particular transaction. The named point might be a terminal delivery area, airport cargo facility, rail yard, warehouse receiving bay, construction site or another location where the seller can lawfully and safely complete unloading.
Under the standard DPU structure:
- the seller contracts and pays carriage to the named destination;
- the seller bears cargo risk through destination unloading;
- the seller unloads the goods from the arriving means of transport;
- the buyer completes destination import formalities and pays applicable duties and taxes; and
- the buyer takes delivery after the unloaded goods are placed at its disposal.
DPU does not automatically decide:
- when title or ownership passes;
- when payment is due;
- whether a product may lawfully be imported;
- who qualifies as importer of record;
- the tariff classification, customs value or duty rate;
- whether a carrier accepts batteries or other regulated goods;
- whether the named site permits the carrier or unloading contractor to enter;
- whether a forklift, crane, tail lift, loading dock or lifting frame is suitable;
- who installs, assembles or moves the goods after unloading; or
- how storage, waiting, detention, demurrage, re-delivery or failed-unloading charges will be treated.
Those matters need separate written instructions and evidence.
Why did DPU replace DAT?
Incoterms® 2020 renamed Delivered at Terminal (DAT) as Delivered at Place Unloaded (DPU). The change makes clear that the delivery location does not have to be a terminal. It can be another suitable named place where unloading can be completed. ICC: Incoterms® 2020 release
The wider choice of place does not make every address suitable. A seller considering DPU to a buyer's premises still needs to verify vehicle access, unloading authority, equipment capacity, operating hours, safety controls and the precise point where the goods will be placed.
Why Must the Named DPU Destination and Unloading Point Be Precise?
For DPU, the named destination is both the end of seller-arranged carriage and the place where unloading must be completed before risk transfers. A vague location therefore creates three linked uncertainties: where the vehicle must go, what unloading service the seller must provide and when delivery is complete.
Writing only DPU Germany, DPU Hamburg or DPU buyer warehouse may not identify the operating point. The real destination might be:
- a specific container terminal and delivery area;
- an airport cargo warehouse after carrier release;
- a rail terminal or bonded facility;
- a distribution-centre yard;
- a warehouse gate, dock or receiving bay;
- a project site with controlled access; or
- a designated ground-placement area beside the arriving vehicle.
The parties should record at least:
- the full facility name and street address;
- the exact gate, dock, bay or placement point;
- the receiving contact and appointment process;
- the vehicle, trailer or container configuration expected;
- available unloading space and ground conditions;
- operating hours and site-access restrictions;
- the party authorized to receive the unloaded goods; and
- the document, timestamp, photograph or electronic record that evidences completed delivery.
A terminal destination
If DPU names a terminal, confirm whether the terminal service actually includes unloading from the arriving means of transport and where the unloaded cargo will be placed. Container discharge from a vessel, terminal handling, container de-stuffing and delivery of loose cargo are different services. A terminal name alone does not establish that every required service is included in the seller's quote.
A buyer-premises destination
If DPU names the buyer's premises, the seller must be able to complete unloading there. The buyer may control the site, but the seller retains unloading responsibility until delivery. The agreement should therefore identify who provides the contractor and equipment, who gives site instructions, and what happens if the vehicle arrives but cannot enter or unload.
A point inside a large site
A factory, distribution centre or project site may contain several gates and unloading zones. The freight price and delivery risk can change if the vehicle must queue, pass security, travel inside the site or reach a restricted bay. Name the point with enough precision that the seller, carrier, unloading contractor and buyer all understand the same endpoint.
When Do Delivery and Risk Transfer Under DPU?
Under DPU, seller risk continues beyond arrival. It includes unloading from the arriving means of transport. Delivery occurs when the unloaded goods are placed at the buyer's disposal at the agreed destination point.
A simplified sequence is:
- The seller or its appointed freight parties collect and load the cargo in China as agreed.
- The seller arranges export clearance and carriage to the named destination.
- The buyer arranges destination import clearance and pays applicable import duties and taxes.
- The arriving vehicle reaches the agreed destination point.
- The seller completes the agreed unloading operation.
- The unloaded goods are placed at the buyer's disposal.
- DPU delivery is complete and cargo risk transfers to the buyer.
Arrival alone is not enough. Opening a trailer or making equipment available is not necessarily completed unloading. The agreed goods need to be removed from the arriving means of transport and placed at the agreed point.
That is why the delivery record should describe the operational event rather than merely say “delivered.” It may record the vehicle, packages, unloading start and finish times, placement point, apparent condition, receiving representative and any exception. The appropriate evidence depends on the cargo, contracts and local practice.
Damage during unloading
Because the seller bears risk through the DPU unloading event, damage occurring during that operation generally remains on the seller's side of the DPU risk boundary. Identifying the responsible carrier, terminal, contractor or insurer is a separate contractual and evidence question. The parties should preserve photographs, exception notes, equipment records and the delivery receipt rather than assume the three-letter term alone resolves liability between every operating party.
DPU does not control title transfer
Incoterms® rules allocate selected delivery, risk, cost and formalities. They do not determine when ownership of the goods passes or when payment becomes due. The sale contract should deal with title, payment, inspection, rejection and remedies separately.
What Must the Seller Arrange and Pay Under DPU?
The seller's standard DPU scope is broader than carriage to an address. It must reach the named destination and complete unloading before delivery.
Depending on the transaction and applicable rule, seller-side planning normally includes:
- supplying the goods and commercial invoice required by the sale agreement;
- checking, packing and marking the goods as agreed and as required for transport;
- arranging origin collection and loading where included in the agreed scope;
- completing applicable China export formalities;
- contracting carriage to the exact named destination;
- handling applicable transit formalities under the standard allocation;
- providing required transport and security information;
- arranging the destination unloading operation;
- bearing cargo risk through that unloading operation;
- giving the buyer sufficient arrival and delivery notice; and
- providing agreed evidence of delivery.
The seller should ensure that its transport and unloading contracts support the promise made in the sale contract. A carrier quotation that stops at a port terminal cannot, by itself, support DPU delivery at an inland warehouse. A road carrier that offers dock delivery but no unloading service may also leave a gap.
Seller responsibility under DPU does not automatically include:
- destination import clearance;
- import permits held by the buyer;
- import duties or taxes;
- services after the unloaded goods are placed at the agreed point;
- unpacking, installation or commissioning; or
- costs created by buyer delay or failure to satisfy buyer-side obligations, subject to the contracts and applicable law.
What Must the Buyer Arrange and Pay?
The buyer's central DPU responsibility is destination import readiness. Seller unloading does not remove the buyer's need to establish a lawful import structure.
Buyer-side planning normally includes:
- identifying the lawful importer and customs broker;
- checking product admissibility and required destination permits;
- supplying import information and instructions on time;
- completing import customs formalities;
- paying applicable import duties and taxes;
- coordinating customs examination or authority requests where required;
- ensuring the receiving site is available and prepared;
- taking delivery after the seller completes unloading;
- arranging movement, storage, installation or use beyond the named point; and
- giving the seller or its contractors the access and safety information needed for delivery.
The buyer should not wait for destination arrival to begin import planning. If the goods cannot be released, the seller's vehicle or cargo may incur terminal storage, waiting, detention, demurrage, re-delivery or other costs. Buyer failure to complete required import formalities, provide required notices or take delivery can also affect risk and cost allocation under the full DPU rule once the goods are clearly identified to the contract. The precise result depends on the rule, sale and carriage contracts, cause and applicable law, so the quotation and exception procedure should address it explicitly.
Who Handles Import Clearance, Duties and Taxes?
Under the standard DPU allocation, the buyer handles destination import clearance and bears applicable import duties and taxes. The seller handles export clearance where applicable and may handle transit formalities, but that does not make the seller the destination importer.
A practical import sequence should be agreed before departure:
Before cargo leaves China
- confirm the destination importer and customs broker;
- review product description, classification inputs and commercial value;
- identify licences, permits, registrations or supporting records that may apply;
- align invoice, packing list and transport-document data; and
- decide how originals, electronic records and pre-arrival information will be exchanged.
Before destination arrival
- submit required pre-arrival or customs data;
- confirm duties, taxes and payment arrangements;
- track customs holds, examinations or document requests;
- confirm release before the final vehicle and unloading appointment where necessary; and
- notify the seller and freight parties of any delay that affects delivery.
At the delivery stage
- verify that customs release and local movement permissions allow the cargo to reach the named point;
- keep the receiving site and authorized representative available;
- coordinate site access with the seller's carrier and unloading contractor; and
- record any exception that prevents unloading or receipt.
DPU does not make a foreign seller legally eligible to act as importer. It also does not decide tariff classification, customs value, product admissibility or a duty rate. These are matters for the actual transaction, destination rules and qualified customs parties. The standard allocation and buyer non-performance provisions should be checked against the complete current DPU rule rather than inferred from a short summary. ICC Digital Library: DPU rule
What Does “Unloaded” Mean in a Real Shipment?
“Unloaded” should be converted into a clear, verifiable operation. The seller and buyer should agree what must be removed, from which arriving means of transport, to which placement point, by which method and with what completion evidence.
Examples illustrate why the detail matters:
- Palletized cartons: removal from a truck with a tail lift or forklift and placement in a marked receiving area may complete unloading.
- Crated machinery: a crane or heavy forklift may be required to lift the crate from a trailer and place it on prepared ground.
- Loose cargo in a container: removing the container from a truck chassis is not necessarily the same as unloading the goods from the container. The contract must define the intended operation.
- Full container shipment: vessel discharge, terminal handling, inland container delivery, de-stuffing and empty-container return are separate stages and charges.
- Airfreight cargo: airline or handling-agent release may precede the separate final-truck unloading event at the named destination.
DPU unloading normally does not mean unpacking every package, moving goods deep inside a warehouse, positioning equipment on foundations, connecting utilities, installing components or commissioning machinery. If these services are intended, they should be defined separately rather than assumed from DPU.
Define the placement point
The end of unloading should identify where the goods will rest. “On the ground beside the vehicle,” “inside receiving bay 4,” “within the terminal's released-cargo zone” and “at the warehouse entrance” are operationally different. The placement point must be accessible, safe and consistent with the unloading contractor's scope.
Define package and condition evidence
The handoff record can include package count, seal status where relevant, visible damage, photographs, timestamps and receiving signatures. A clean delivery receipt should not be signed automatically if there is an observable shortage or exception. The parties should follow the applicable carrier, insurance and contract notice procedures.
How Should Labour, Equipment and Site Access Be Defined?
DPU works only when the seller can arrange and control a viable unloading operation. The equipment plan should be based on actual cargo and site facts, not a generic assumption that “the destination has a forklift.”
Cargo data
Provide:
- package type and count;
- dimensions and gross weight of each handling unit;
- total shipment weight;
- lifting points and centre of gravity where relevant;
- stackability and orientation limits;
- fragility, hazardous characteristics or temperature constraints;
- photographs or drawings showing the handling configuration; and
- any manufacturer handling instructions.
Equipment and contractor data
Confirm:
- who appoints and pays the unloading contractor;
- forklift, crane, tail-lift or other equipment type;
- rated capacity at the required lift height and reach;
- forks, slings, spreaders, beams or frames needed;
- operator qualification and local permissions;
- availability window and standby terms; and
- what happens if the planned equipment is unsuitable.
Site data
Confirm:
- vehicle height, length, weight and turning restrictions;
- gate, dock and yard dimensions;
- ground bearing capacity, slope and surface condition;
- overhead clearance and nearby obstructions;
- dock leveller or loading-bay compatibility;
- restricted operating hours, noise limits or permit conditions;
- site induction, personal protective equipment and escort requirements;
- weather thresholds and lighting; and
- emergency and incident-reporting contacts.
The buyer controls much of the destination information even though the seller bears unloading responsibility. The buyer should therefore provide accurate access and site data early enough for the seller to plan. If the seller cannot verify or control safe unloading at the intended point, the parties should consider whether DAP is operationally more suitable.
Which Charges Are Included, Excluded, Provisional or Direct-Pay?
DPU defines a responsibility framework, not a complete price list. A quotation should show which services are included and what happens when assumptions fail.
Scroll sideways to compare the full table.
| Charge or service | What the quotation should state |
|---|---|
| China pickup | Address, vehicle type, free waiting time and access assumptions |
| Origin loading | Who provides labour/equipment and whether loading is included |
| Export formalities | Declarant/broker scope and excluded permits, inspections or special services |
| Origin handling | Warehouse, terminal, documentation, security and screening items |
| Main carriage | Mode, route, service basis, surcharges and validity |
| Transshipment | Planned handoffs, restrictions and exception treatment |
| Destination terminal | Handling, release, storage-free time and excluded local charges |
| Import clearance | Buyer responsibility, importer/broker structure and information deadlines |
| Duties and taxes | Buyer-paid actual amounts; avoid presenting estimates as guaranteed totals |
| Final transport | Named endpoint, vehicle, appointment, access and waiting assumptions |
| Unloading | Contractor, labour, equipment, placement point and included time |
| Special handling | Crane, heavy lift, permits, escort, lifting plan or regulated-cargo requirements |
| Exceptions | Storage, detention, demurrage, examination, re-delivery, failed access and cancellation |
Mark each line as included, excluded, provisional, at cost or payable directly. Record the currency, tax basis, rate validity, cargo assumptions and trigger for adjustment. This is more useful than presenting one DPU total with hidden destination or unloading assumptions.
How Does DPU Compare with DAP, DDP, CPT and CIP?
Scroll sideways to compare the full table.
| Rule | Seller-paid carriage | Delivery and risk point | Destination unloading | Import clearance and duties/taxes | Seller insurance obligation |
|---|---|---|---|---|---|
| DPU | To the named destination | After unloading at the named destination | Seller | Buyer | No standard obligation |
| DAP | To the named destination | On the arriving means of transport, ready for unloading | Buyer bears unloading risk | Buyer | No standard obligation |
| DDP | To the named destination | On the arriving means of transport, ready for unloading | Buyer bears unloading risk | Seller, subject to legal feasibility | No standard obligation |
| CPT | To the named destination | Earlier, when delivered to the contracted carrier | Not the defining seller obligation | Buyer | No standard obligation |
| CIP | To the named destination | Earlier, when delivered to the contracted carrier | Not the defining seller obligation | Buyer | Seller procures the rule's required cover |
This matrix is a planning summary, not the complete rule text. Use the full current Incoterms® 2020 rules and the actual contracts for a transaction.
DPU vs DAP
DPU and DAP are both destination-delivery rules and normally leave import clearance with the buyer. Their central difference is unloading. Under DPU, the seller delivers after unloading. Under DAP, the seller delivers with the goods on the arriving means of transport, ready for the buyer to unload. ICC Academy: DPU or DAP?
Use the dedicated guide to review DAP shipping from China when the buyer, rather than the seller, should bear the destination unloading responsibility.
DPU vs DDP
DPU gives the seller the unloading obligation but leaves import clearance, duties and taxes with the buyer. DDP gives the seller the import-clearance and duty/tax obligation but normally delivers ready for unloading rather than after unloading.
DDP can be difficult where a foreign seller cannot lawfully or practically act as importer. DPU avoids assigning import clearance to the seller, but it still requires a capable buyer-side importer. See DDP shipping from China for that separate responsibility model.
DPU vs CPT
Under both DPU and CPT, the seller may pay carriage to a named destination. Risk transfer is different. Under CPT, delivery and risk normally transfer earlier when the goods are handed to the contracted carrier, even though the seller pays freight onward. Under DPU, seller risk continues through destination unloading. See CPT shipping from China for the carrier-handoff model.
DPU vs CIP
CIP also separates seller-paid onward carriage from an earlier carrier-handoff risk point and includes a seller obligation to procure insurance meeting the rule's standard. DPU keeps seller risk through destination unloading and does not impose a standard seller obligation to procure cargo insurance for the buyer. See CIP shipping from China for the insurance and handoff structure.
When Is DPU a Practical Choice—and When Is It Not?
DPU can be practical when:
- the seller can contract carriage and unloading to the exact destination;
- the cargo dimensions, weights and handling method are known;
- a reliable unloading contractor and suitable equipment are available;
- the seller can obtain destination access and operating information;
- the buyer has a workable importer and customs-broker plan;
- the parties can coordinate customs release, vehicle arrival and equipment availability; and
- the completed unloading event can be documented.
DPU may be a poor fit when:
- the final unloading point is vague or likely to change;
- the buyer's site controls equipment and labour that the seller cannot contract or supervise;
- cargo weight, centre of gravity or lifting points are unknown;
- access, ground capacity or safety rules have not been checked;
- customs release timing is uncertain and the final vehicle cannot wait;
- the seller's quote ends at a terminal but the sale term names an inland address; or
- the parties expect the buyer to unload while still writing DPU.
In these situations, DAP may create a clearer boundary if the buyer is better placed to control unloading. The commercial term should match the operation that the parties can actually perform.
What Changes When DPU Cargo Contains Batteries?
DPU allocates selected commercial responsibilities. It does not classify a battery, approve its condition or packaging, establish carrier acceptance or make a product importable.
For a battery or battery-powered product, the shipment review may need to establish:
- the product name, model and intended use;
- battery chemistry and applicable transport identity;
- whether batteries are shipped alone, packed with equipment or contained in equipment;
- cell or battery rating/content as relevant;
- new, used, prototype, damaged, defective, recalled or waste status;
- package type, count, individual dimensions and weights;
- gross shipment weight and handling-unit arrangement;
- packing method, protection against short circuit and movement, and package condition;
- available test summaries, safety data and supplier records where applicable;
- marks, labels and transport-document requirements for the selected mode;
- route, carrier/operator and destination restrictions; and
- handling or unloading controls arising from weight, state or package design.
The United Nations Manual of Tests and Criteria includes subsection 38.3 for relevant lithium and sodium-ion cells and batteries, while transport requirements are implemented through the applicable modal and national frameworks. A UN38.3 test summary or SDS/MSDS is not, by itself, a universal booking approval. UNECE: Manual of Tests and Criteria
The DPU seller still bears cargo risk through destination unloading, but dangerous-goods duties can apply to multiple participants according to their actual functions and the governing rules. The sale term does not override those requirements.
Scroll sideways to compare the full table.
| Record | Purpose |
|---|---|
| DPU sale term | Allocates selected delivery, carriage, risk, unloading and import responsibilities |
| Carrier booking | Defines route, service, cargo declaration and transport conditions |
| Dangerous-goods classification | Determines the regulated identity and applicable mode requirements |
| Packing and marks/labels | Prepare the actual package for the selected mode and configuration |
| Import plan | Confirms product admissibility, importer, broker and destination controls |
| Unloading plan | Confirms equipment, contractor, site access, placement and delivery evidence |
BAT Logistics can review supplied shipment facts and coordinate a route and carrier enquiry within the agreed freight scope. Final classification, packing, carrier acceptance, import treatment, duties/taxes, unloading method and delivery depend on the actual cargo, documents, current rules, operating parties and route. Start with the broader guide to shipping batteries from China.
Build a Practical DPU Delivery-and-Unloading Record
Keep one shared record that the commercial, logistics, customs, carrier, unloading and receiving teams can use before cargo release.
Sale term and parties
- Full DPU reference and Incoterms® edition
- Seller, buyer and invoice parties
- Purchase order or contract reference
- Product value and currency
- Separate title and payment provisions
Named destination and unloading point
- Full address or terminal/facility name
- Exact gate, dock, bay or placement point
- Postcode and receiving contact
- Operating hours and appointment window
- Definition of completed unloading and delivery evidence
Transport scope
- China pickup and origin-loading party
- Modes, route, transshipment and planned carriers
- Included origin, main-carriage and destination services
- Rate validity and cargo-acceptance conditions
- Exception charges and escalation contacts
Export and import
- China exporter/consignor/declarant structure
- Export broker and required documents
- Destination importer and customs broker
- Classification, valuation and permit responsibilities
- Duties/taxes, examination and release process
Cargo and packing
- Product/model and quantity
- Package type, count, dimensions and individual/gross weights
- Lifting points, centre of gravity and handling limits
- Battery/dangerous-goods details where applicable
- Photographs and available supporting records
Unloading operation
- Arriving vehicle or transport unit
- Contractor, labour and equipment
- Equipment capacity, attachments and operating radius
- Site access, ground, dock and safety conditions
- Permits, induction and personal protective equipment
- Weather, lighting and operating limits
Handoff and exceptions
- Arrival-notice process
- Unloading start and completion records
- Package count and visible-condition record
- Placement point and receiving authority
- Waiting, failed access, failed unloading and re-delivery procedure
- Damage, shortage and escalation evidence
A complete record is more useful than repeating “DPU” across emails without defining the physical unloading event.
How Should a Buyer Review a DPU Freight Quotation?
Use the following review before accepting a DPU quotation:
1. Full Incoterm reference
Does the quote state DPU, the precise named place and point, and the Incoterms® edition?
2. Exact destination and placement point
Can the carrier and unloading contractor identify the gate, bay or ground area where the unloaded goods will be placed?
3. China pickup and loading
Who supplies the pickup vehicle, labour and equipment? Are waiting, access and failed-pickup charges stated?
4. Cargo and handling data
Are package count, dimensions, individual weights, total weight, lifting points, centre of gravity and handling restrictions accurate?
5. Route and transport modes
Does the quote show the planned modes, transfer points, service level and destination-carriage endpoint?
6. China export structure
Who is the exporter/consignor and who completes the declaration? Which permits, inspections or special services are excluded?
7. Destination importer plan
Has the buyer identified the lawful importer and broker? Are information deadlines, permit responsibilities, duties and taxes clear?
8. Freight and surcharge scope
Are base freight, fuel, security, terminal, delivery and other surcharges itemized with currency and validity?
9. Destination exceptions
How are examinations, storage, detention, demurrage, waiting, re-delivery and failed access charged?
10. Unloading contractor and equipment
Who books the contractor? What equipment, capacity, attachments, permits and operating time are included?
11. Site readiness and safety
Who supplies access details and approves the unloading method? What happens if the site or placement point is unavailable?
12. Delivery and exception evidence
What proves arrival, unloading, placement, package count and visible condition? Who records and escalates damage or shortage?
If any item is unknown, mark it pending rather than hide it inside a fixed total. A DPU price is dependable only to the extent that the cargo, route, customs, access and unloading assumptions are dependable.
DPU Shipping Questions Buyers Ask
What does DPU mean in shipping?
DPU means Delivered at Place Unloaded. The seller arranges carriage and bears cargo risk through unloading at the precisely named destination. Delivery occurs after the unloaded goods are placed at the buyer's disposal.
Who pays freight under DPU?
The seller arranges and pays the agreed carriage to the named destination, including the unloading needed to complete DPU delivery. The quotation should still itemize terminal, final-delivery, equipment, waiting and exception charges.
When does risk transfer under DPU?
Risk transfers after the seller has unloaded the goods from the arriving means of transport and placed them at the buyer's disposal at the agreed destination point.
Who unloads the goods under DPU?
The seller bears the unloading obligation and risk under the standard DPU allocation. The actual work may be performed by a carrier, terminal or unloading contractor appointed within the seller's delivery scope.
Who handles import clearance, duties and taxes under DPU?
The buyer under the standard DPU allocation. The buyer should establish the lawful importer and customs-broker plan before departure and keep the seller informed of any clearance delay affecting delivery.
Is DPU the same as the former DAT rule?
DPU replaced DAT in Incoterms® 2020. The new name makes clear that delivery after unloading can occur at a suitable named place, not only at a terminal.
Is DPU the same as door-to-door shipping?
No. DPU is an Incoterms® sale-contract rule. Door-to-door describes an operating transport scope. A service can reach the buyer's premises without satisfying every DPU responsibility unless unloading and the commercial handoff are expressly included. See door-to-door shipping from China for the broader service workflow.
What is the difference between DPU and DAP?
DPU delivers after seller-side unloading. DAP delivers with the goods still on the arriving means of transport, ready for buyer-side unloading. Both normally place import clearance, duties and taxes with the buyer.
What is the difference between DPU and DDP?
DPU places destination unloading with the seller and import clearance with the buyer. DDP places import clearance, duties and taxes with the seller but normally leaves unloading risk with the buyer.
Does DPU make battery cargo compliant or carrier-accepted?
No. DPU is a commercial allocation rule. Battery classification, condition, testing evidence, packing, marks/labels, documents, route restrictions, destination requirements and carrier acceptance must be reviewed separately for the actual shipment.
Request a Shipment-Specific DPU Route, Import and Unloading Review
A useful DPU review starts with the exact unloading point and physical handling plan—not with a freight total alone.
Send BAT Logistics:
- the China pickup address and exact named DPU destination;
- the gate, dock, bay or placement point for the unloaded goods;
- seller, supplier and exporter information;
- destination importer and customs-broker plan;
- product name, model, quantity and commercial value;
- battery chemistry, configuration and condition where relevant;
- package count, dimensions, individual and gross weights;
- lifting points, centre of gravity and handling limits where relevant;
- packing details, drawings and photographs;
- preferred transport mode, route and cargo-ready date;
- destination access, appointment, equipment and safety requirements; and
- available commercial, product, customs and transport documents.
BAT Logistics can use the supplied facts to review the intended route, carrier enquiry, China export coordination, destination handoff and quotation scope. The final Incoterm wording, importer structure and unloading method should be confirmed by the parties and their qualified advisers or contractors. Carrier acceptance, dangerous-goods classification, customs treatment, duties/taxes, charges, transit, unloading feasibility and delivery remain shipment-specific.


